How long does a boiler installation take?

Most residential boiler replacements are completed in one day (6–10 hours). A like-for-like high-efficiency swap is often done in a single visit; a system change (for example, converting to a combi, re-piping, or adding an indirect tank) can take 1–3 days. You are usually back to full heat and hot water the same day.
★ 4.9/5 · 85+ reviews✅ Licensed & TSBC gas-fitting🎉 Since 1999💰 Rebates handled

Get your free quote

Tell us about your installation—we’ll call you back fast.

No obligation · We never share your info

What happens on installation day?

A typical CANRO boiler install follows the same clean, predictable sequence so you know what to expect and your home stays tidy.

  1. Isolate and drain the old system, then remove and haul away the old boiler.
  2. Set the new unit and update near-boiler piping, circulators and the expansion tank.
  3. Run new high-efficiency venting and the condensate drain, and confirm gas sizing.
  4. Fill, purge air, fire the boiler, set combustion, and commission the controls.
  5. Walk you through the new system and book the TSBC inspection.

What can make it take longer?

Conversions (cast-iron to condensing, or system to combi), asbestos on old pipe insulation, a gas line that needs upsizing, or hard-to-access mechanical rooms add time. We flag any of these at the quote stage so there are no day-of surprises. Explore our full boiler services.

BC Permits and Technical Safety BC Requirements for Boiler Replacement

In British Columbia, replacing a gas-fired boiler is a regulated activity under the Safety Standards Act. Before our technicians connect your new boiler to the gas line, CANRO pulls a Gas Permit through Technical Safety BC, which is a legal requirement — not optional paperwork. Our gas licence LGA0043870 and boiler licence LBP0046450 authorize us to obtain and close these permits. Homeowners who hire unlicensed contractors skip this step, which voids appliance warranties, creates liability exposure, and can prevent future property sales.

Once the installation is complete, a Technical Safety BC inspector must sign off before the appliance is commissioned for continuous use. In Metro Vancouver, residential inspections are typically booked within one to five business days. We coordinate the inspection booking as part of every job. If your timeline is tight, let us know during the quote — we schedule permit applications the moment you confirm the work so we lose no unnecessary days.

  • Gas Permit: required for any new gas appliance connection or re-piping under BC Safety Standards Act
  • Boiler Permit (LBP): required when replacing a hydronic heating appliance rated above certain BTU thresholds
  • Inspection hold: system must not run unattended until Technical Safety BC closes the permit
  • Documentation you receive: permit number, inspection certificate, and updated appliance data plate — keep these for your home file
  • Permit cost: included in CANRO quotes — never a surprise add-on at invoicing

How Metro Vancouver Homes Affect Installation Complexity

The age and construction type of your home are among the biggest variables in how long a boiler installation takes. Metro Vancouver's housing stock ranges from pre-1970 concrete high-rises in Vancouver proper to 1980s wood-frame townhomes in Burnaby and Coquitlam, to newer detached homes in Surrey and Langley. Each presents different challenges: older homes often have gravity-fed or single-pipe steam systems, undersized gas lines at 1/2-inch instead of the 3/4-inch required for modern high-efficiency units, and original chimneys that cannot handle the cool exhaust from a condensing boiler.

High-efficiency condensing boilers vent through PVC pipe rather than a masonry chimney, which is a significant advantage in Metro Vancouver's damp climate — but routing that PVC to an exterior wall can add one to three hours of labour in a condo mechanical room or a townhome with limited exterior access. If your home uses in-floor radiant heat rather than baseboard radiators, the technician must also verify that the new boiler's lower water temperature range is compatible with the slab loop design. Our team assesses all of this during the pre-installation site visit so surprises do not appear on installation day. For a full overview of what we cover, visit our boiler services page.

  • Pre-1970 homes: likely need gas line upsizing; add 2-4 hours
  • Condo mechanical rooms: elevator scheduling and strata notice can add half a day of coordination
  • Single-pipe or gravity systems: balancing valves and air eliminators often required — plan for a two-day job
  • Radiant in-floor systems: confirm low-temperature compatibility (40-55 C) before selecting a boiler model
  • Older chimneys: may need a stainless liner or full PVC conversion for condensing units

How CANRO handles your boiler installation

Every CANRO installation follows the same honest, code-driven process so there are no surprises: a free in-home assessment and correct sizing, a written upfront price, clean professional installation by our licensed technicians, full commissioning, and a passed inspection—with the permit and any rebate paperwork handled for you. We’ve served Metro Vancouver since 1999 and are rated 4.9 stars across 85+ Google reviews. Explore boiler installation.

Rebates & financing

High-efficiency and electrification upgrades can qualify for CleanBC, BC Hydro, FortisBC and federal Greener Homes rebates—sometimes several thousand dollars. CANRO is a registered contractor and we handle the paperwork. See our rebates & financing page, and ask about interest-free options on qualifying upgrades.

Keep reading

Related installation questions

Good to know

More frequently asked questions

Will I be without heat or hot water overnight?
Rarely. We schedule replacements so the new boiler is commissioned and running before we leave. If a multi-day conversion is needed, we plan around keeping you comfortable.
Do you remove the old boiler?
Yes — removal, haul-away and environmentally responsible disposal of the old unit are included in every installation.
How soon can you start?
Most non-emergency installations are booked within a few days. If you have no heat, call (604) 359-1081 and we will prioritize you.
Is an inspection part of the timeline?
Yes. The municipal/TSBC gas inspection is arranged after the install; the system runs in the meantime and we handle the paperwork.
Do I need to be home for the full installation day?
We recommend being present at the start so our lead technician can walk through the scope with you and confirm gas shut-off locations and any access points. After that first 30-45 minutes, most homeowners leave for work and return at completion. We will call you before testing the system so you are there for the commissioning walkthrough, where we show you the new controls, set the operating temperature, and review maintenance basics. If that is not possible, we can record the walkthrough on your phone.
Will my home be without heat overnight if the job runs into a second day?
If a job requires two days — typically a system-change, single-pipe conversion, or a job awaiting Technical Safety BC inspection — we leave your home without an operating boiler overnight only when outside temperatures allow it safely. In cooler Metro Vancouver months (October through April), we bring a temporary electric space heater for your main living area at no charge, and we prioritize next-morning return to complete commissioning before midday. We tell you this before we book, not the evening of day one.

Need heat, hot water or cooling? Talk to a real technician today.

25+ years keeping Metro Vancouver homes comfortable. Honest advice, upfront pricing, work that lasts.

📞 Call (604) 359-1081 Get a free quote →
📞 Call nowFree quote